Answer
Below is a group of How-to's that are related to the topic of 'Creating Workflows' in the CDD to PLM transition category. Click on their links to find more information on these topics.
General:
- What are the prerequisites for creating a Design Verification Workflow?
- How to create and launch the Design Verification Workflow?
- How to define the set of data that needs to be approved by the Design Verification Workflow?
- How can I run the Design Verification workflow Preconditions Report ?
- How to define the assignees of the Design Verification workflow control activities ?
- How to define the list of Additional Reviewers on a given Part ?
- How to define the Approval Group responsible for the old CDD Control 3 / Approval Process ?
- What are the Control Rules allowed for validating data with the Design Verification workflow ?
- How can I discard / abandon an active Design Verification Workflow ?
- How to reassign the Design Verification Workflow activities?
Drawing Workflows:
- How to validate a Drawing in the PLM Platform ?
- How to replace a Drawing with another one ?
- What are the prerequisites to perform an Assign Drawing(s) Label Workflow ?
- How to create and launch the Assign Drawing(s) Label Workflow ?
RFC in PLM:
- How to get access to the "Ready For Check in PLM" SmarTeam command?
- What requirement must be met to use Ready For Check in PLM?
- How to launch a Ready For Check in PLM on a SmarTeam Document?
- How does the state of CAD Documents migrated via Ready For Check in PLM change after performing a Design Verification Workflow ?
- How to deal with objects in "Ready for Check (RFC)" or "Checked" state when running a "RFC in PLM"?
- How to reset/abandon a Ready For Check in PLM?
- How does the concept of “Responsibility” relate to the Ready for Check-in PLM SmarTeam feature?
- How to deal with Integration Data and Ready for Check in PLM?
Category