Answer
Below is a group of How-to's that are related to the topic of 'Creating Life Cycles' in the SmarTeam - Life Cycles subcategory. Click on their links to find more information on these topics.
- What is "Ready For Check" transition?
- How to use baselines in SmarTeam?
- How to use Valid For Integration in SmarTeam?
- How to use Released For Integration in SmarTeam?
- When is needed the Catch Up tool?
- How to find drawings I am responsible for and that are in Checked lifecycle state?
Ready For Check in PLM:
- How to get access to the "Ready For Check in PLM" SmarTeam command?
- What requirement must be met to use Ready For Check in PLM?
- How to launch a Ready For Check in PLM on a SmarTeam Document?
- How to reset/abandon a Ready For Check in PLM?
- How to deal with objects in "Ready for Check (RFC)" or "Checked" state when running a "RFC in PLM"?
- How does the state of CAD Documents migrated via Ready For Check in PLM change after performing a Design Verification Workflow ?
- How does the concept of “Responsibility” relate to the Ready for Check-in PLM SmarTeam feature?
Category