What is the "Ready For Check in PLM" SmarTeam command ?

Answer

The aim of Ready For Check in PLM is to validate SmarTeam data via the PLM, instead of CDD. 

This command needs to be executed in SmarTeam and triggers the migration of the collected data to the PLM.

The Design Verification Workflow replaces the CDD control process and it is composed by:

- Design Documentation Check: replaces the CDD Control 1

- Part Design Approval: replaces the CDD Control 2

- Review by Approval Group: replaces the CDD Control 3 / Approval Process (mandatory for QAC A Control Rule, optional otherwise)

 

Complete documentation: