Answer
Below is a group of How-to's that are related to the topic of 'Reviewing Workflows' in the CDD to PLM transition category. Click on their links to find more information on these topics.
- How can I control the Design Verification workflow activities I am responsible for ?
- How to perform the CDD Control 1 in the PLM?
- How to perform the CDD Control 2 in the PLM?
- How can I be informed I have been assigned to a Design Verification Workflow activity ?
- How to retrieve the list of all workflows activities that I have been assigned to ?
- How to delegate a Design Verification Workflow activity ?
- How does the state of CAD Documents migrated via Ready For Check in PLM change after performing a Design Verification Workflow ?
Category